Pre-installation material preparation of cold storage

Pre-installation material preparation of cold storage

  • 2020-12-28

1. Cold storage equipment materials should be equipped according to cold storage engineering design and construction materials, cold storage board, warehouse door, refrigeration unit, refrigeration evaporator (cooling fan or exhaust pipe), microcomputer temperature control box, expansion valve, connecting copper pipe, cable control Lines, library lights, sealants, mounting accessories, etc. are matched and the materials and accessories are checked.


2. Before the transportation and installation, the number of cold storage plates should be checked according to the invoice. When loading and unloading the plates, it should be handled lightly, and the anti-scratching layer should be laid on each floor of the library and the ground joint.

© Copyright: 2021 Dongguan Yiyun Refrigeration Technology Co., Ltd All Rights Reserved.

IPv6 network supported

top

Send A Message

Send A Message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.